iTaskApp Services
iTask Services iTask Services
iTask Marketplace iTask Marketplace
See All ServicesSee All
  • User
  • Sign in
  • Create account
iTaskApp Services
  • Home
  • Discount Club
  • About Us
  • Blog
Additional Menu Options
More
Dashboard
Home
Messages
Notifications
Back

New Task

New Light Switch Installation


Installing switches should be done by a licensed professional, as it requires an installation of a fixture in a spot with no existing power supply.


An electrician will bring the power to the location and terminate the switch.


Procedure:


  • Turn Off the Power. Turn off the power to the switch circuit by switching off the circuit breaker in your home's service panel (breaker box)
  • Test for Power
  • Remove the Old Switch
  • Inspect and Disconnect the Switch Wiring
  • Connect the New Single-Pole Switch
  • Complete the Job