Installation of the new stove and oven is carried out by certified technicians. The removal of the old unit and delivery of the new one is sometimes included into the service.
Procedure:
- Obtain the correct gas connector
- Turn off the gas valve
- Wrap threads with TeflonĀ® tape
- Attach the gas connector
- Attach the street elbow
- Tighten the gas connector nuts
- Turn on the gas and check for leaks
- Slide gas stove into place and secure mounting plate